DESIGN PARAMETERS
1.
The package shall be designed as a hybrid power
package (50% solar modules), such that power from the generator and/or the grid
will be available for at least 6 hours daily.
2.
Installations to
come with a 12-month maintenance-free guaranty.
SYSTEM PROPOSED
Genset/Grid/solar hybrid
power package.
MAIN EQUIPMENT DETAILS
The equipment to be deployed
for this installation shall be as follows.
- SOLAR MODULES
High quality poly crystalline
solar modules.
Comes with a 25-year linear
performance guarantee.
- SOLAR CHARGE CONTROLLER
Advanced maximum power point
tracking (MPPT) battery charger for off-grid photovoltaic systems.
Comes with a 5-year
manufacturer’s warranty.
- INVERTERS
High quality true
sine/modified wave inverters.
Comes with a 2-year
manufacturer’s warranty;
- BATTERIES
High quality Valve regulated
Lead Acid (VRLA) AGM batteries.
Comes with a 1-year
manufacturer’s warranty.
Renewable Energy Solutions For Homes And Offices
|
|||||||||||||
Item
|
Description
|
Make &
Catalogue Ref. |
Basic
Rate |
Rate
Fixed |
Qty
|
Unit
|
Total
Cost |
||||||
Product Breakdown For A
Duplex And 3bedroom Flat Load Requirement
|
|||||||||||||
1
|
5w Led Light Fittings
|
Osram & Ge
|
4,000
|
1,000
|
20
|
Nos
|
100,000
|
||||||
2
|
50w Rechargeable Standing Fan
|
Kdk
|
10,000
|
2,500
|
4
|
Nos
|
50,000
|
||||||
3
|
50w 14inch Led Tv
|
Lg
|
30,000
|
7,500
|
4
|
Nos
|
150,000
|
||||||
4
|
50w Mini Fridge
|
Lg
|
40,000
|
10,000
|
1
|
Nos
|
50,000
|
||||||
5
|
1000w Inverter System Complete With All Ancillary Works
|
Xantreks
|
100,000
|
25,000
|
1
|
Nos
|
125,000
|
||||||
6
|
200ah Deep Cycle Batteries
|
70,000
|
17,500
|
4
|
Nos
|
350,000
|
|||||||
7
|
250w Solar Panel Complete With All Ancillary Works
|
50,000
|
12,500
|
6
|
Nos
|
375,000
|
|||||||
8
|
Switches
|
Legrand
|
10,000
|
2,500
|
1
|
Lot
|
12,500
|
||||||
9
|
Sockets
|
Legrand
|
10,000
|
2,500
|
1
|
Lot
|
12,500
|
||||||
10
|
Trunking & Accessories
|
Legrand
|
100,000
|
25,000
|
1
|
Lot
|
125,000
|
||||||
11
|
Wiring
|
Nigerchin
|
50,000
|
12,500
|
1
|
Lot
|
62,500
|
||||||
Overall Total
|
1,412,500
|
||||||||||||
Item
|
Description
|
Make &
Catalogue Ref. |
Basic
Rate |
Rate
Fixed |
Qty
|
Unit
|
Total
Cost |
||||||
Reoccuring Expenditure
After 2-3 Years Extracted From Above
|
|||||||||||||
1
|
5w Led Lamps
|
Osram & Ge
|
2,500
|
625
|
20
|
Nos
|
62,500
|
||||||
2
|
200ah Deep Cycle
Batteries
|
70,000
|
17,500
|
4
|
Nos
|
350,000
|
|||||||
Overall Total
|
412,500
|
||||||||||||
Reoccuring Expenses At
Per Year Rate Under Fair Maintenance = N412,500/2 -Batteries Failed In 2
Years
|
206,250
|
||||||||||||
Reoccuring Expenses At
Per Year Rate Under Excellent Maintenance -Batteries Failed In 3 Years
= N412,500/3
|
103,125
|
||||||||||||
Why You must consider XFT.
Office buildings account for nearly 20 percent of commercial building sector energy use.
Energy is often a property’s single largest operating expense, representing up to 30 percent of a typical office building’s costs. Fortunately, energy-saving opportunities abound in most commercial office spaces. Studies have shown that it is possible to achieve energy savings of up to 20 percent simply by commissioning existing building systems; some companies have reported energy consumption reductions of 35 percent, solely through changing building operation and management strategies.
In addition, energy savings can improve net operating income, increasing asset value.
• Energy costs represent, on average, 20-28% of total operating expenses in commercial office buildings.
• 20-30% of energy cost can be salvaged by simply adding XFT to your fuel. This implies a saving of up to N17,976.00 on a 50kva genset on full load weekly, and up to
1. N 89,880.00 on a 250kva genset on full load weekly,
2. N89,880.00 on 500kva weekly,
3. N412, 675.20 on 1000kva weekly at 40 hours per week and so on.
Now imagine the cost savings yearly.
Cost of treatment being N500 for every 50litres after 2 treatment on full tank.
Office buildings account for nearly 20 percent of commercial building sector energy use.
Energy is often a property’s single largest operating expense, representing up to 30 percent of a typical office building’s costs. Fortunately, energy-saving opportunities abound in most commercial office spaces. Studies have shown that it is possible to achieve energy savings of up to 20 percent simply by commissioning existing building systems; some companies have reported energy consumption reductions of 35 percent, solely through changing building operation and management strategies.
In addition, energy savings can improve net operating income, increasing asset value.
• Energy costs represent, on average, 20-28% of total operating expenses in commercial office buildings.
• 20-30% of energy cost can be salvaged by simply adding XFT to your fuel. This implies a saving of up to N17,976.00 on a 50kva genset on full load weekly, and up to
1. N 89,880.00 on a 250kva genset on full load weekly,
2. N89,880.00 on 500kva weekly,
3. N412, 675.20 on 1000kva weekly at 40 hours per week and so on.
Now imagine the cost savings yearly.
Cost of treatment being N500 for every 50litres after 2 treatment on full tank.
Fuel
Optimisation Through Treatment
Extreme Fuel Treatment Prices
|
|||||||||||||||||||||||||||||||||
Items
|
Contrainers Sizes
|
Prices (N)
|
The First 2-3 Treatments
|
After 3 Treatments
|
Price/Litre After 3
Treatments
|
Your Savings After 3 Treatment
|
|||||||||||||||||||||||||||
1
|
1ml Bottle
|
200
|
5litres
|
10litres
|
N20/Litre
|
N61/10 Litres
|
|||||||||||||||||||||||||||
2
|
5ml Bottle
|
800
|
25litres
|
50litres
|
N16/Litre
|
N500/50 Litres
|
|||||||||||||||||||||||||||
3
|
10ml Bottle
|
1,500
|
50litres
|
100litres
|
N15/Litre
|
N1100/100 Litres
|
|||||||||||||||||||||||||||
4
|
29.5ml Bottle
|
4,000
|
150litres
|
300litres
|
N14/Litre
|
N3800/300 Litres
|
|||||||||||||||||||||||||||
5
|
59.14ml Bottle
|
7,000
|
300litres
|
600litres
|
N12/Litre
|
N8600/600 Litres
|
|||||||||||||||||||||||||||
6
|
118.3ml Bottle
|
13,000
|
600litres
|
1200litres
|
N11 /Litre
|
N31000/1200 Litres
|
|||||||||||||||||||||||||||
Tel:
+2348025357926, +2348037871708
Email:Hwsl2014@Gmail.Com,
|
|||||||||||||||||||||||||||||||||